This is NOT an official map.
cut The First Class Partnership Pre-Feasibility study recommends that "the existing surface line through the city centre would be dropped in cutting". We do not know the location of the cutting but if it was located on the south side of the existing line, it would solve the problem of crossing the CN rail line west of Kitchener.